Earlier this fall, survey work done in the Edison Sno-Park trail system revealed that many of the trails needed to be brushed to make them usable in low snow conditions. Eric Ness volunteered to take on coordination of this work.
On Sunday, November 21, a CONC volunteer group of 9 people converged on the Edison Sno-Park for brushing and clearing the final section of trails. Warren Preston and Charlie Kearns led two groups of brushers, armed mostly with loppers and hand saws, while Eric Ness led a group to cut any downed trees.